A prefabricated house being transported on the back of a flat-bed lorry caused tailbacks in both directions during this morning’s rush hour.
The lorry got stuck on the A379 at Harraton Cross.
Traffic started moving again around 8.45am
A prefabricated house being transported on the back of a flat-bed lorry caused tailbacks in both directions during this morning’s rush hour.
The lorry got stuck on the A379 at Harraton Cross.
Traffic started moving again around 8.45am
Comments
To leave a comment you need to create an account. |